These photos show the work in the front yard. Although most of the visible work at this time is in the back of the church, where the major construction is under way, there is also a lot of earth-moving going on in front.
An excavation for a six-inch water main has been completed, and the pipe put in place. It will feed the new fire sprinkler system in the basement of the present church and in the new addition.