The concrete block walls of the lower level of the church addition are nearing completion. In this picture, made on August 4, masons are laying the last few courses of blocks before reaching the main floor level of the existing church. What used to be the main entrance to the church, between the choir room and the kitchen, is now an empty opening which will connect with the new addition. Inside the building, asbestos removal is proceeding, and today a second shift of workers was brought in to work in the afternoon and evening.
Kit Cone