Wednesday, August 27, 2008

Ready to Pour the Concrete Floor

The installation of reinforcing rod for the floor of the lower level of the new parish hall wing has been completed. For this purpose, the metal rod is supplied in welded mats, which are very strong and speed up the installation process. The next step is to bring in the concrete, pour it, level it, and finish the surface. In the photo above, white pipe fittings can be seen at left where bathroom facilities will be located.

Kit Cone