Sunday, November 2, 2008

Columbarium Patio Is Taking Shape

The retaining wall for the new columbarium patio outside the parish hall was poured on Saturday, November 1. A transit-mix concrete truck, at far left, emptied its contents into the concrete pump shown in the middle of the photograph, and it was pumped up and over the archway of pipe to the section of the wall where masons were working. The patio will form a physical link between the parish hall and the rear yard and columbarium.

Kit Cone