Photos and notes from Kit Cone:

Fire sprinklers are being installed in the classroom area of the church basement as part of the construction project. A new six-inch water main will be installed from the street to the building to supply the fire sprinklers. An automatic alarm will summon the Fire Department in the event that the sprinkler system is activated.

The installation of paving blocks in the area under the port cochere has been completed. Because the driveway is curved, the installation involved a lot of cutting and fitting of the stone blocks.