Thursday, August 14, 2008

Masonry Walls Going Up Fast

With the walls for the lower level of the new church addition completed, scaffolding has been erected to continue building upward on the walls of the new church hall. A mobile material hoist has been brought in to lift pallets of concrete block up to the second floor level, where they are stacked on the scaffolding to be used in building the walls. At lower left in this photo, a workman applies waterproof sheeting to the finished concrete block walls of the lower level.

Kit Cone